Knightsbridge Way Reconstruction & Water Main Improvements
The Project consists of water replacement and pavement rehabilitation at Knightsbridge Way from Elliott Drive to Danrose Drive. The pavement rehabilitation method is asphalt grind and inlay/overlay and cold in-place recycling on Knightsbridge Way and asphalt grind and inlay on all Cul-de-Sac Streets. Work includes, but is not limited to, distribution of public notices, mobilization, traffic control, storm water pollution prevention, curb ramp upgrades, asphalt grind and inlay, cold in-place recycling, asphalt concrete base repair, adjusting utility covers to grade, reinstallation of survey monuments, signage and striping, abandonment of existing water main and water valves, installation of new water main and water valves, installation of water services and all appurtenances, hydrant improvements and all appurtenances, testing of new water installation on Knightsbridge Way in American Canyon. This project is funded by the Napa Countywide Sales Tax Measure T and State SB1/RMRA.
Specifications
(click to expand/collapse)
Name | Size | ||
TR23-0100 Knightsbridge Specifications | 19.3 MB |